Header Graphic
Message Board > How Is GI Plate Earthing Installed Effectively?
How Is GI Plate Earthing Installed Effectively?
Login  |  Register
Page: 1

rashmeeeyadav
1 post
Aug 24, 2025
11:45 PM
GI Plate Earthing is installed effectively by following a systematic process to ensure long-lasting performance and safety. First, a pit of around 2.5 to 3 meters is dug, where the GI plate is placed vertically to maximize contact with the soil. The plate is surrounded by layers of charcoal and salt to maintain soil moisture and reduce resistance. A GI strip is then connected to the plate and brought above ground for electrical connection. Regular watering of the pit ensures consistent conductivity. For reliable and durable gi plate earthing solutions, Oriental Star Earthing Solutions provides trusted products and services.


Post a Message



(8192 Characters Left)


www.milliescentedrocks.com

(Millie Hughes) cmbullcm@comcast.net 302 331-9232

(Gee Jones) geejones03@gmail.com 706 233-3495

Click this link to see the type of shirts from Polo's, Dry Fit, T-Shirts and more.... http://www.companycasuals.com/msr